Home / Projects & Shipments
Our Legacy

Monumental
Projects & Deliveries

Delivering massive ODC/OWC cargo across extreme terrains and international borders — from the Himalayas to the deep-sea ports of India.

Mega Projects

Projects That Define Us

From 100 MT cargo to time-bound port operations — our track record speaks for itself.

PAN India → JNPT

Multi-Origin Consolidation

50+ Vehicles
Mega Project 01

AKS Project — Massive Multi-Origin Mobilization

Transportation of over 50 vehicles from all corners of the country to JNPT / Mumbai Old Port / Sahar Air Cargo.

60 ft

Max Length

19 ft

Max Width

14 ft

Max Height

100 MT

Max Weight

Mega Project 02

Subansiri DAM HEP, Arunachal Pradesh

Transportation of heavy machinery to one of India's largest hydroelectric projects in the remote Northeast.

9×

SK380 Machines

40 MT each — Sricity to Dollungmukh, AR

2×

Volvo Loaders

Heavy loaders to project site

4×

Ajax Machines

From Bangalore

30+

Other Shipments

From various locations across India

Subansiri DAM HEP

Arunachal Pradesh

45+ Shipments

Sapura Energy

Ambernath ↔ Vizag Port

20+ Vehicles
Mega Project 03

Sapura Energy — Time-Bound Rig Call Operation

Time-bound transportation of 20+ vehicles from Ambernath and Rohini Yard to Vizag Port and vice versa during a critical rig call at Vizag Port. Executed with military precision under tight deadlines.

Ambernath → Vizag Rohini Yard → Vizag Vizag → Return
Mega Project 04

High-Value Consignments — GE, Pune

Successfully delivered over 100 Automatic Electronic Panels (each panel approximately INR 1.5 Crore) to different ports safely and without a single incident.

₹
150+ Cr

Total Cargo Value Handled Safely

GE, Pune

Zero-Damage Delivery

100+ Panels
Beyond Borders

International & Extreme Terrain

From Nepal mountains to Meghalaya hills — conquering geography, one shipment at a time.

Nepal 🇳🇵

Arun 3 Project, Nepal

Transportation of machines and import containers from various locations across India to the remote project site in Nepal. Cross-border logistics with customs coordination.

Cross-border logistics Import container coordination Remote site delivery
Arunachal Pradesh

Selapass Tawang Road Project (BRO)

Delivered Boomer and other heavy machines to the extreme Selapass project site in Arunachal Pradesh. Operating at elevations exceeding 13,000 feet for Border Roads Organisation.

13,000+ ft elevation BRO project Boomer & heavy machinery
Meghalaya

Ganol SH Project, Meghalaya

Transportation of Boomer machines & DG sets from the highly hilly terrain of Rohtang Pass, and other machines from Bangalore to Tura project site.

Rohtang Pass transit Bangalore → Tura DG set logistics
Jammu & Kashmir

IRCON Tunnel T15 — Ramban, Jammu

Transported heavy tunnel machinery to Ramban, Jammu and coordinated cement bag logistics from Karnal railway siding up to the project site.

Tunnel machinery Railway siding coordination Cement logistics
Maharashtra

Tecnicas Reunidas — Stack Transport

Transportation of 2 massive stacks (17' height each) from Padgha to GAIL, Alibag, overcoming multiple route challenges including low-hanging power lines and narrow village roads.

17' height stacks Route engineering Padgha → Alibag
Gujarat

Mega Pipe Movement — Mundra Port

Mega transportation of 1,200 MT pipe from Anjar to Mundra port within an extremely tight schedule of just 7 days. Fleet mobilization and round-the-clock execution.

1,200 MT in 7 days Anjar → Mundra 24/7 execution
Cargo Logs

Machine Delivery Log

Every machine, every route, every delivery — precision documented.

Heavy Excavators

4× SK220 Machines

From

Sricity

→

To

Jammu

TSR Series

3× TSR 30 Machines

From

Kanchipuram

→

To

Kishtwar

Drilling Equipment

2× 820 Jumbo Drill Boomers

From

JNPT, MH

→

To

Selapass, AR

Import Handling

Import Boomers

From

Kolkata

→

To

Tumlingtar, Nepal

Cross-Border

EPIROC Boomer

From

Nashik

→

To

Khandbari, Nepal

Extreme Hilly

Boomer Machine

From

Rohtang Pass

→

To

Meghalaya

40 MT each

9× SK380 Machines

From

Sricity

→

To

Dollungmukh, AR

Excavators

2× PC210 Machines

From

Kanchipuram

→

To

Kiru

Heavy Transport

2× ARGO 4000 Machines

From

Bangalore

→

To

Tura, Meghalaya

Batch Movement

34× PC71 Machines

From

Kanchipuram

→

To

Bhubaneshwar

34×

Largest Batch Movement

40T

Heaviest Single Machine

🇳🇵

International Deliveries

13K

Max Elevation (ft)

Have a Challenging Project?

No terrain too tough, no cargo too heavy. Let OALS plan your next move.

Contact Us